The EU Waste Shipment Regulation: what it means for scrap metal
Regulation (EU) 2024/1157 sets the rules for moving waste, scrap metal included, within, into and out of the EU. It has applied since 21 May 2026. This guide covers the parts a scrap metal trader meets on every shipment.
What is the EU Waste Shipment Regulation?
It is Regulation (EU) 2024/1157 on shipments of waste. It replaced Regulation (EC) No 1013/2006, whose provisions kept applying until 21 May 2026, the day the new regulation began to apply.
The regulation decides which procedure a shipment follows, what documents travel with it, who is responsible if it goes wrong, and which countries waste may be exported to.
Which procedure applies to scrap metal?
There are two. The first is the general information requirements in Article 18. It applies to green-listed waste, the waste in Annex III, when it is shipped for recovery in a quantity above 20 kg. Clean metal scrap under Basel entry B1010 is on that list.
The second is prior written notification and consent. It applies to hazardous waste, to waste listed in Annex IV, to mixtures that are not listed in Annex IIIA, and to green-listed waste that is contaminated enough to raise the risk or to prevent sound recovery.
So the same load of scrap can fall under either procedure. What decides it is what the load contains, not what it is called.
What does Article 18 require for a green-listed shipment?
- The person who arranges the shipment holds a permit or a registration under the Waste Framework Directive.
- The waste goes only to a recovery facility that holds a permit or registration, and the facility shows proof of it before the shipment.
- The person who arranges the shipment completes the Annex VII form no later than two working days before the shipment starts. The actual quantity, the carriers and any container number can be added up to the start.
- The information is available electronically to everyone involved, and to the authorities, including during transport.
- The recovery facility confirms receipt within two working days of receiving the waste.
- The recovery facility certifies that recovery is complete no later than 30 days after it is completed, and no later than one year after receipt.
- A written contract for the recovery of the waste is in place between the person who arranges the shipment and the consignee.
What must the contract contain?
Article 18(10) lists the minimum: the person who arranges the shipment, the consignee and the facility, the people who represent each party, a description of the waste, its identification codes, the quantity covered, the recovery operation and how long the contract is valid.
The contract must be in place by the time the Annex VII form is completed and must stay in force until the certificate of recovery is issued. It must also say who takes the waste back, or has it recovered another way, if the shipment or the recovery cannot be completed or turns out to be illegal.
When the waste moves between two sites of the same legal entity, a declaration by that entity can replace the contract.
Can waste be mixed during a shipment?
No. Article 19 prohibits mixing the waste with other waste, substances or objects from the start of the shipment until a recovery facility receives it.
Can scrap metal be exported outside the OECD?
Article 40 prohibits exports of non-hazardous waste for recovery to countries where the OECD Decision does not apply, unless the country is on a list that the Commission adopts under Article 41.
These export rules start later than the rest of the regulation. Article 86 sets the dates. If you sell to buyers outside the OECD, check the Commission's list for your waste and your destination before you agree a shipment.
How is the paperwork filed?
Electronically. Article 27 requires the information and documents to be submitted and exchanged by electronic means, through the central system the Commission runs. That system is called DIWASS.
Where does Zairon fit?
Zairon is a trading platform for scrap metal exporters and buyers in Europe. It is coming soon and is not open for trading yet.
You list a lot once. Zairon fills in the Annex VII form from the listing and prepares it for DIWASS. The contract fixes the price formula and terms, and a regulated payment provider holds the buyer's money until the weight and assay are confirmed on arrival.
Sources
Checked against the sources below on 12 November 2026.
- Regulation (EU) 2024/1157 on shipments of waste, on EUR-Lex
- Digital Waste Shipment System (DIWASS), European Commission Green Forum
- Directive 2008/98/EC on waste (Waste Framework Directive), consolidated text of 5 July 2018, on EUR-Lex
Rules vary by material, waste code and route, and they change. Check the current text and ask a qualified adviser. This is not legal advice.